Waste generated during CH2’s construction was recycled wherever possible.
During construction the builder was contractually required to produce and implement a comprehensive waste management plan and to achieve a minimum of 80 per cent recycling of all waste produced on site (as required by the Green Star credit).
The final recycling of building materials amounted to over 87 per cent of all waste produced in site.
CH2's commitment to recycling has continued with a comprehensive recycling program adopted within the building. All kitchen facilities incorporate waste separation.